TurfMargin
Home / Guides / Sod Installation Prep Checklist (and How to Bid It)

Sod Installation Prep Checklist (and How to Bid It)

Most sod jobs are won or lost in prep. The sod itself is the easy line item; tear-out, grading and soil work are where bids go wrong.

Before the job

  • Call 811 for utility locates before any digging or grading.
  • Measure the area twice; sketch curves and obstacles.
  • Confirm sod variety, supplier cut day and delivery window.
  • Confirm water access for the customer after install.
  • Decide disposal route for old turf and where it will be dumped.

Day of install

  • Remove or kill existing turf as scoped.
  • Rough grade away from structures; fill low spots.
  • Add topsoil or amendments if soil testing or inspection calls for it.
  • Fine grade and roll or firm the surface.
  • Lay sod in staggered rows with tight seams; start on a straight line.
  • Cut edges with a sharp blade and roll for contact.
  • Water thoroughly the same day.

Pallet and bid math

Pallets      = ROUNDUP(area x (1 + waste %) / sq ft per pallet)
Total cost   = pallets x pallet cost + tear-out + topsoil + labor
Bid          = total cost / (1 - target margin)
Profit/sq ft = (bid - total cost) / area

Sq ft per pallet differs by grower and sod type; ask your supplier. Pallets are bought whole, so rounding up matters: a job that needs 6.1 pallets costs 7.

Calculate it with the Sod Installation & Prep Bid Calculator. Give the customer written watering instructions; establishment failures become your callbacks.

Open the calculator